2017
Dupuis, M., April, A., Lesage, P., & Forgues, D. (2017). Method to Enable LCA Analysis through Each Level of Development of a BIM Model. Procedia Engineering, 196(Supplement C), 857-863. doi:https://doi.org/10.1016/j.proeng.2017.08.017
Dupuis, M., April, A., Lesage, P., & Forgues, D. (2017). Method to Enable LCA Analysis through Each Level of Development of a BIM Model. Procedia Engineering, 196(Supplement C), 857-863. doi:https://doi.org/10.1016/j.proeng.2017.08.017
Hiver 2018 - Rapport de l'équipe ÉTS: L W Mbog, R Comlan, A Borisutpech, J - P Leclerc: https://publicationslist.org/data/a.april/ref-613/Rapport%20Final-UBUBI.pdf
Automne 2017 - Rapport de l'équipe ÉTS: N Bastien, G Forgues, André Koolen, E Le Barbenchon: https://publicationslist.org/data/a.april/ref-606/PFE_RAPPORT_EQ15_UBUBI.pdf
Été 2017 - Rapport de l'équipe ÉTS back-end UBUBI: S Gergel, Y Messen Jean, É Picard: https://publicationslist.org/data/a.april/ref-593/Rapport_final_équipe17v1.3.pdf
Été 2017 - Rapport de l'équipe ÉTS front-end UBUBI: C trudel, D Enachescu, J - P bertrand-Dorion, A Sivaneswaran: https://publicationslist.org/data/a.april/ref-592/GTI795-LOG795%20Rapport%20final%20équipe%20008.pdf
Automne 2016 - Rapport de Projet de fin d'études ÉTS: Philippe Pigeon: https://publicationslist.org/data/a.april/ref-569/LOG792_RapportFinal_PIGEON_Philippe_v2.pdf